Articles of agreement entered into this second day of December, one thousand eight hundred thirty, between Eli Farwell and Samuel Farwell. ______
In the one part & the Delaware and Raritan Canal Company by their president on the others part whereby it is convenient and agreed as follows, to wit,
The said Eli and Samuel Farwell [space left blank] convene and agree to construct and finish in every respect in the most substantial and workmanlike manner the Lock number ten eleven twelve + thirteen [space left blank] of the Delaware and Raritan Canal and to furnish all the materials except cement and iron. The walls to be not less than six feet thick at bottom and four feet thick under the coping with two offsets on the back of the walls of one foot each at such heights as shall be directed by the Engineer, the walls to be not less than one hundred and fifty feet in length from the head to the ends of the wings measured in the centre of the Lock. The first six and a half feet from the foundation to be laid with large good shaped stone, and to have placed in the face of the walls three range timbers six by ten inches square, secured in the walls by ties dovetailed into the range timbers, four feet long and placed six feet apart, this part of the walls to be covered with good three inch [word cut off, possibly inch] white pine plank well spiked or treenailed. All that part of the wall extending from the upper gates to the head of the Lock above the six and a half feet to be laid with good hammered or scabbled stone not less than ten inches in thickness, except the upper two feet and the coping which shall be of cut stone, the remainder of the walls shall be of good cut stone such quality as shall be appraised of by the Engineer, and to be laid in cement well backed with stone of large size and good shape and grouted at every course, the rough stone and scabbled work to be laid in cement and grouted, headers shall be provided for every course of stone not less than two feet wide and four feet in length at every eight feet in length of the walls. No face stone shall be less than ten inches thick nor less than twelve inches bed and no stone shall have less bed than face.
The coping of the Lock walls to be cut stone three feet wide and one foot thick and not less than four and a half feet in length, the hollow quoin coping to be four and a half feet square or cut from a stone of that size. The breast of the Locks to be of rough stone laid in cement and raised to within one foot of the bottom of the upper level of Canal and coped with a stick of Oak timber twelve by sixteen inches square and to pass four feet into both side walls with a stick five feet long framed to each end and to project two feet beyond the head of the Lock into which pieces shall be placed bumping posts twelve by sixteen inches square and well secured to the Lock walls and to a stick [blank] bumping timber on each side of the Lock extending to the Canal banks, there shall also be three additional sticks on each side and planked to support the embankment, the planking to extend five feet below bottom water line of the upper level, and an apron six feet wide to extend across the head of the dock and fitted to the side planking and well puddled below and above the apron. The timbers for the foundation must be at least twelve inches square and forty feet in length and laid two feet from center to center, except under the miter sills, these to be placed side by side, the whole to be laid perfectly level and well beded to prevent settling and the spaces between the timbers to be filled with good earth or gravel and well packed, two causes of pile plank or sheet piling to be placed across the bottom, four feet in length one course at the head and the other under the lower miter sill, to be of two inch plank jointed.The whole foundation to be floored with good two inch plank jointed and well tree-nailed, after the Lock walls are laid the chamber of the Lock is to be floored with good two inch white pine plank jointed and spiked to the foundation timbers, the spikes to be at least eight inches in height. The mitre sills to be of good white oak timber eighteen inches wide and eight inches thick to be well secured to the foundation timbers with two-inch treenails and one and a half inch iron bolt. The gates to be constructed of good white oak timbers free from shakes or other imperfections and to be of such size and form as shall be directed by the Engineer, with two valve gates in each gate of such size and form as the Engineer shall direct. All the iron work except spikes to be furnished by the Company but to be put on by the said Eli & Samuel Farwell [space] as shall be directed by the Engineer. And the said Eli and Samuel Farwell [space] do hereby further promise and agree that will from time to time during the progress of the work conform to such deviations and alterations in any part of the work as the Engineer may direct, and the said Engineer may add to or diminish the account of work in any of the Locks provided for in this agreement but if the contractor shall thereby incur any additional expense they shall be paid therefore such additional price as the said Engineer shall adjudge to be right and equitable. And the said Eli and Samuel Farwell [space] do hereby further agree that if in the opinion of the Engineer shall unreasonably neglect to prosecute the work hereby contracted to be done or shall perform the same or any part thereof imperfectly, or shall refuse or unreasonably neglect to do it over again or remedy such imperfections to the satisfaction of the said Engineer, he shall have power to determine that this contract has been abandoned and such determination shall exonerate the said Company from every obligation imposed upon them by this contract and they may immediately proceed to dispose thereof in such manner as if it had never existed.
And to avoid disputes as well as interruption & hinderances to the regular & peaceable progress of the different parts of the work & to prevent unnecessary injury to the rights & prosperity of the neighbors in the vicinity of the Canal the Engineer shall dismiss from the service of the Company every quarrelsome disorderly person and such as shall be addicted to habits of interference or who shall eventually commit any unnecessary trespass, either upon the person, land, or other property of the citizens living traveling or working upon the line of the Delaware & Raritan Canal, and every contractor shall dismiss all similar persons employed under him whenever thereto directed by the Engineer or assistant Engineer. And further if at any time any mechanic or workman employed on said work shall be found unfaithful or believed to be so by the Engineer of said Company then & in that case the said Engineer shall have power to direct that any such person be forthwith dismissed & no longer employed by the said Contractor on any part of [blank space] work. And further if any bad or imperfect materials are brought upon the ground & disapproved of by the Engineer they shall be forthwith removed to such distance from the work as shall be directed & if not attended to immediately by said contractor said materials shall be removed at their expense by the direction of the Engineer. And the said [space] Eli and Samuel Farwell [space] further promise & agree to perform the several stipulations of this contract by themselves and handle under their immediate superintendance and not by a sub contractor or contractors & to finish and deliver up this contraction or before the first day of.
And they further promise and agree that they will not give or sell any ardent spirits to their hands or to any other person on or near the line of the Canal or allow any to be brought onto or near the work by the laborers or any other person. And the said Delaware & Raritan Canal Company do hereby promise & agree that they will provide all the cement & iron work except spikes, the cement to be delivered at the nearest convenient loading place or warehouse on the Raritan River. And will pay to the said for completing this contract as follows. For cut stone including the wall immediately back of it seven dollars forty seven cents per perch of twenty five cubic feet. For hammered or scabbled work four dollars & forty four cents per perch for rough stone work four dollars & six cents per perch for coping, three feet wide & one foot thick two dollars & eight cents per foot, for hauling cement furnishing & washing said per Lock two hundred & seventy eight dollars for hollow quoins for walls below top water line one hundred & eighty four dollars for timber works including four dollars sheetpiling & gates one thousand eight hundred [illegible] dollars [illegible].
And the said Company further agree that in order to enable the contractor to carry on their work there shall be paid on or about the first day of each month after the commencement of the work such a sum as shall be certified by the Engineer for labor done & materials furnished at the Lock site in [unclear] into the work in such manners as to be perfect security for the said money paid.
And it is further agreed that in order to ensure the faithful performance of this contract in every part five percent of the whole amount shall be retained and kept until the water shall be let into the Canal and pass through the said Lock of the intended depth and the said Lock proved by water to be well and faithfully executed & every part done complete & perfect. And whatever expense shall accrue or in any way arise by unfaithfulness or want of skill in the execution of said work shall if paid be refunded or deducted from the said five per cent and the balance if any shall then be paid over to the said contractor at the office of said Company, and a final settlement made upon a certificate given by the Engineer in the employ of said Company of the fulfillment of this contract. Provided that the said Company shall be bound to let in the water to prove the said work within two months from the completion of said Locks. And it is hereby mutually agreed by & between the parties hereto that if stone suitable for building the Lock shall not be found within the line of the Canal they shall be obtained elsewhere on the most favorable terms but in no case shall the Company be charged for such stone more than six and a quarter cents per cubic yard. And it is hereby further mutually agreed that in case of the absence and inability to act of the said Engineer that then and in that case the Junior Assistant Engineer who shall be in the employ of the Company shall have and he is hereby invested with all the powers herein before given to the said Engineer in the premise. And that the [unclear word, looks like “submissore”] herein contained shall be considered decreed and taken as an essential part of this contract and shall not be removable by either of the parties there unto. And lastly it is hereby further agreed that the decision of the said Engineer or Assistant shall be final and conclusive in any dispute which may arise between the parties. In witness whereof, the said parties have hereunto set their hands and seals the day and year above written sealed and delivered
in the presence of
Eli Farwell
Canvass White
Samuel Farwell